[1] H. Dyckhoff, “A typology of cutting and packing problems”, European Journal of Operational Research, vol. 44, pp. 145-159, 1990.
[2] John Levine, Frederick Ducatelle, Ant Colony Optimization and Local Search for Bin Packing and Cutting Stock Problems, Journal of the Operational Research Society 55, 705-716, July 2004.
[3] Thomas Stützle, Holger Hoos, MAX-MIN ant system, Future Generation Computer Systems, 16(8):889–914, 2000.
[4] Monika Čeri, Iva Malović, Evolucijske strategije, http://www.zemris.fer.hr/~golub/ga/studenti/projekt2007/es.html
[5] John Levine, Frederick Ducatelle, Ant Colony Optimization and Local Search for Bin Packing and Cutting Stock Problems, Journal of the Operational Research Society 55, 705-716, July 2004.
[6] Janne Karelahti, Solving the cutting stock problem in the steel industry, Master's thesis, Helsinki University of Technology
[7] R. Hinterding and L. Khan, “Genetic algorithms for cutting stock problems: with and without contiguity,”,Progress in Evolutionary Computation (X. Yao, ed.), vol. 956 of Lecture Notes in Artificial Intelligence, Berlin, pp. 166-186, Springer, 1995.
[8] Falkenauer, E.A, & Delchambre, A., “A Genetic Algorithm for Bin Packing and Line Balancing”, Proceedings of 1992 IEEE International Conference on Robotics and Automation(RA92), pp. 1186-1193, Nice 1992.
[9] Frankola, T., diplomski rad br. 1626, Rješavanje problema raspoređivanja aktivnosti projekata evolucijskim algoritmima, Zagreb, Fakultet elektrotehnike i računarstva, listopad, 2006.
[10] Marko Čupić, Prirodom inspirirani optimizacijski algoritmi, 2008.
[11] Jakobović, D., Frankola, T., Golub, M., Evolutionary Algorithms for the Resource Constrained Scheduling Problem, Cavtat, Int. Conf. On Information Technology Interfaces, lipanj, 2008.
[12] Priyanto, Adiwijaya, Maharani, Implementation of ant colony optimization algorithm on the project resource scheduling problem, Faculty of Informatics, Institute of Technology Telkom
[13] Liang, Chen, Kao, Chyu, An ant colony approach to resource-constrained project scheduling problems, Department of Industrial Engineering and Management, Yuan Ze University